A.M. Arkhipov, MPEI (TU); A.A. Vagner, OJSC “RAO UES of Russia”; N.I. Solovyev, OJSC CKB “Energoremont”;
V.V. Abramov, OJSC “Zapadno-Sibirskaya TPP”
TP-87 boiler of OJSC “Zapadno-Sibirskaya TPP” was reconstructed in 2005 under development of Boiler Plants and Ecology in Power Engineering Department of the Moscow Power Engineering Institute – MPEI TU and according to the project of OJSC “CKB Energoremont”. A layout diagram of burners and nozzles, as well as of the feeding air lines in the longitudinal furnace section is shown in Fig. 1.85.