Ilyin Е.T. CJSC “Complex energy systems”
The conducted studies showed that a heating load of a heat supply boiler-house, operating in a hot water supply mode makes only 14…37% of the installed capacity, depending on climate conditions of the boiler-house location. Therefore, for building up of heating boiler-houses GT of medium and low capacity are required in order to provide operation of the GTU with complete utilization of exhaust gas heat.