6.3.3. Gas turbine building-up of water heating boilers and installation at low capacity thermal power plants

Part 6. ADVANCED TECHNOLOGIES AND POWER INSTALLATIONS FOR THERMAL AND ELECTRIC ENERGY GENERATION

6.3. Heat and power supply units of low capacity

6.3.3. Gas turbine building-up of water heating boilers and installation at low capacity thermal power plants

Ilyin Е.T. CJSC “Complex energy systems”

The conducted studies showed that a heating load of a heat supply boiler-house, operating in a hot water supply mode makes only 14…37% of the installed capacity, depending on climate conditions of the boiler-house location. Therefore, for building up of heating boiler-houses GT of medium and low capacity are required in order to provide operation of the GTU with complete utilization of exhaust gas heat.